4. Risk Management

4. Risk Management

  • STEP 4: RISK MANAGEMENT
  • Identifying and mitigating risks that could impact the success of the mission. This includes both technical risks (related to the system’s design and performance) and programmatic risks (related to budget and schedule).
  • NEXT STEP: INTEGRATION

Related Works

  • 9. REVISE & REFINE

    9. REVISE & REFINE

    Methodology
  • 3. Refinement

    3. Refinement

    Methodology
  • 6. Verification and Validation

    6. Verification and Validation

    Methodology
  • 2. System Design

    2. System Design

    Methodology